Estimate overview
Every figure here is a from-price band. We confirm the final scope after an on-site visit or a clear photo set, then send a written estimate that lists included work, excluded work, and billed extras such as materials, wall-type surcharge, and disposal.
No surprise line items. If the job changes on site, we stop and re-quote before continuing.
Price factors
Five inputs decide most of the number: the task family, the wall you are drilling into, the fixings we have to buy, how we reach the room, and what has to leave the flat afterwards. Each one is quoted separately, so you can drop a line if you do not need it.
Sample estimate
A typical half-day booking in a Kyiv apartment. Price bands are quoted before the visit and confirmed after a photo or on-site assessment.
Total range, four tasks
1 700 ₴ – 2 750 ₴
Billed separately: materials and parts, a wall-type surcharge on reinforced concrete, and removal or disposal of old fixtures. The estimate is non-binding until the scope is confirmed.
Estimate notes
Every figure we send is a working range, not a contract price. These notes explain what stays open until the assessment and what is billed on top of the labour band.
A range is built from task type, room count and typical wall construction. A firm figure follows an on-site visit or a clear photo set, and it may move in either direction.
Some tasks are carried out by vetted independent contractors working to the same scope sheet. Credentials and insurance documents can be checked on request before the visit.
We are not responsible for damage or faults that existed before work started, including unstable plaster, old wiring, seized fittings and hidden moisture. Anything found on site is reported before it is touched.
Duration bands assume clear access, standard materials and no hidden defects. Waiting on a part, a building lift booking or a second trade adds time, and we confirm the new slot before continuing.
Materials, wall-type surcharges, waste disposal and out-of-hours calls sit outside the labour band. Each extra is listed as a separate line so the final invoice can be checked against the estimate.
Need a line explained? Send your estimate reference through the estimate request form, or review what affects the final price.